Energy Initiator® and Project Activator
Services provided
Energy Initiator® and Project Activator (was Energy Activator®)
Benefits achieved
Potential £275k of energy savings
Summary
The customer is a global business providing power systems for use on land, at sea and in the air with a $59.2bn order book and a global energy spend of approximately £90m Even though this customer is a non - energy intensive business it nevertheless still uses approximately 60% of its energy in the manufacturing processes.
The NDT Washline
The specification for the tanks within the NDT area had included 3600 insulation but when surveyed by JRP Solutions using thermal imaging it became apparent that no insulation was installed on the base of the tanks or parts of the supply pipes which contributed towards annual energy losses of £82k.
Results
Using the Energy Initiator® methodology and software, JRP identified nine improvement measures and used Energy Activator® to manage the implementation of the improvement projects, saving the customer a total of £32k per annum, with an average payback of 1.2 years.
Using both Energy Initiator® and Project Activator across several UK and European sites to date for this customer, over 250 low cost and medium cost improvement measures have been identified and delivered realising in excess of £275k of energy savings.
All improvement measures are recorded and managed with Project Activator which measures their impact in terms of energy, emissions and costs providing a real focus to the customer’s Continuous Improvement Programme.
For more information, request the full case study below.
REQUEST THE FULL CASE STUDY
Enter your details to get access to the full case study
We are offering downloads of our full case studies to energy and sustainability professionals involved in any stage of their organisation’s energy or sustainability journey. If you would like to receive a copy of this case study, simply request your download here.
"*" indicates required fields