Skip to content
company_technical-800x450-3
Manufacturing & Engineering

ESOS compliance and project implementation

Client: Amtico
Services:
Energy Audit/Survey ESOS
Sector:
Manufacturing & Engineering

Services provided

Audit of energy saving opportunities to comply with the requirements of The Energy Savings Opportunity Scheme, ESOS, and implementation of projects identified.

Benefits achieved

£200k pa potential savings with average payback of 1.32 years, c£90k delivered to date.

Summary

Amtico appointed JRP Solutions to carry out an ESOS audit of their organisation which comprises three sites; the main manufacturing site, a new warehouse building in Coventry and offices in Solihull The main manufacturing site consists of two factories and is quite complex from a manufacturing perspective.

Results

JRP’s audit identified savings potential in the following areas:

  1. Staff awareness programme
  2. Data analysis and monitoring
  3. Lighting
  4. Insulation of steam and condensate system
  5. Review of factory air balance
  6. Compressed air
  7. Automatic shut down and start-up of process machinery
  8. Automatic door shutters
  9. Adjustment to sensitivity of automatic hot water taps
  10. Chiller optimisation
  11. Optimisation of air conditioning and isolation of computers/monitors.

In total JRP identified £200k pa potential savings with an average payback of 1.32 years, c£90k delivered to date

For more information, request the full case study below.

REQUEST THE FULL CASE STUDY

Enter your details to get access to the full case study

We are offering downloads of our full case studies to energy and sustainability professionals involved in any stage of their organisation’s energy or sustainability journey. If you would like to receive a copy of this case study, simply request your download here.