Skip to content
Elephant
Energy | 
19/12/21

Turning white elephants green!

Sometimes with the best intentions and some very good projected results, energy efficiency projects or equipment are commissioned and installed and then either never turned on OR turned on and then not operated in the way in which they were intended. Up and down the land, I have seen expensive technologies sitting idle and not […]

JRP Energy Solutions Image

Sometimes with the best intentions and some very good projected results, energy efficiency projects or equipment are commissioned and installed and then either never turned on OR turned on and then not operated in the way in which they were intended.

Up and down the land, I have seen expensive technologies sitting idle and not fulfilling their potential once commissioned and installed. I asked around our consultants if they had had any similar experiences. Sadly the answer was a very loud yes!

To find out why this happens and what can be done to prevent it, please read George’s article in the January 2021 issue of Energy Managers’ Magazine here.